例8
“Time for Completion” means such time for completing the execution of the Works and passing the Tests on Completion of the Works or any Section or part thereof as is specified in the Contract from the Commencement Date.
注释:
(1) time for completion:竣工时间
(2) the execution of the Works:施工
(3) any Section or part thereof:工程的任何部分或区段,thereof:of the Works
参考译文:
竣工时间是指合同规定从工程开工日期算起到工程或其任何部分或区段施工结束并且通过竣工检验的时间。
例9
The Employer shall, prior to the submission by the Contractor of the Tender, have made available to the Contractor, such data on hydrological and subsurface conditions as have been obtained by the Employer or the Representative on behalf of the Employer from the investigations into the Works provided that the Contractor shall be responsible for his own interpretation thereof.
注释:
(1) make available to the Contractor….:向承包人提供……
(2) data on hydrological and subsurface conditions:水文地质资料
(3) his own interpretation thereof:自己对上述资料的解释 thereof:of the data
参考译文:
在承包人提交投标书之前,业主应向承包人提供由业主或业主代表根据对该项工程的勘察所取得的水文地质资料,但是承包人应对他自己对上述资料的解释负责。
例10
If this Agreement is terminated for any reason whatsoever, all such drawings, transparencies, specifications, and any other manufacturing or engineering information as are supplied by Party A, including all the copies thereof, shall be returned to Party A, and Party B shall cease to manufacture the said Licensed Products or Components, or parts of the Licensed Products.