英文合同翻译详解(三十六)

时间:2007-06-29 17:28来源: 作者: 点击:
  

注释:

(1) specifications:规范

(2) any modification thereof or addition thereto:对规范的任何修改或增补 thereof:of the Specifications;thereto:to the Specifications

(3) under Clause 95:根据第95条规定


参考译文:

规范是指合同中包括的工程规范,以及根据第95条规定的或由承包商提出并经工程师批准的对规范的任何修改或增补。


例5:

The Defects Liability Certificate for the Works shall, within 28 days after the expiration of the Defects Liability Period, be issued by the Engineer, or, if different defects liability periods become applicable to different Section or parts of the Permanent Works, the expiration of the latest such period, or if, pursuant to Clause 82, any works instructed are completed to the satisfaction of the Engineer, the Defects Liability Certificate therefor shall be issued by the Engineer as soon as possible.


注释:

(1) the Defects Liability Certificate:缺陷责任证书

(2) the expiration of the Defects Liability Period: 缺陷责任期终止

(3) different defects liability periods become applicable to different Section or parts of the Permanent Works:不同的缺陷责任期适用永久工程的不同区段或部分

(4) any works instructed:任何按指示进行的工程


参考译文:工程的缺陷责任证书应由工程师在缺陷责任期终止后28天内颁发,或者,如果不同的缺陷责任期适用永久工程的不同区段或部分时,则在最后一个缺陷责任期终止或根据第82条,在任何按指示进行的工程已完成并达到工程师满意之后尽快签发。


例6:

The Borrower shall pay for the account of the Banks a commitment fee of one half of one percent (0.5%) per annum on the Total Loan Commitment. The commitment fee shall be paid from the date of the conclusion of the Contract (inclusive) to the earlier day of the Disbursement Date and the Termination Date (but excluding the day in question). The commitment fee shall quarterly be paid from the date in the third month thereafter to the earlier day of the Disbursement Date and the Termination Date.


 